Sunday, October 26, 2008

10-26-08 The Remaining TO DO List

  • Finish priming walls (DONE)
  • Waterproof Shower (DONE)
  • Paint (Atmosphere Blue) (DONE)
  • Install closet door (DONE)
  • Paint/Stain bath door, change knob
  • Replace window
  • Carrera tile shower floor (DONE)
  • Subway tile shower wall (DONE)
  • Tile floor (DONE)
  • Install shower glass (DONE)
  • Install toilet (DONE)
  • Baseboards (3/4 DONE)
  • Install vanity (Pegasus Gazette & Carrera Marble) (DONE)
  • Install lighting (sconces, canister & closet)
  • Install fixtures (sink, magazine rack, shower, towel bar) (1/2 DONE)
  • Install electrical wall fixtures
  • Install closet shelves & wall system
  • Create access to pump
    Estimated Completion Day: November 25
    , 2008

No comments: