- Finish priming walls (DONE)
- Waterproof Shower (DONE)
- Paint (Atmosphere Blue) (DONE)
- Install closet door (DONE)
- Paint/Stain bath door, change knob
- Replace window
- Carrera tile shower floor (DONE)
- Subway tile shower wall (DONE)
- Tile floor (DONE)
- Install shower glass (DONE)
- Install toilet (DONE)
- Baseboards (3/4 DONE)
- Install vanity (Pegasus Gazette & Carrera Marble) (DONE)
- Install lighting (sconces, canister & closet)
- Install fixtures (sink, magazine rack, shower, towel bar) (1/2 DONE)
- Install electrical wall fixtures
- Install closet shelves & wall system
- Create access to pump
Estimated Completion Day: November 25, 2008